Day 4 update!


  Minor work done, but the floor is complete!, shot of the extra pieces left over for soffiting.
Shot of the last two floor pieces to be laid...
 Onto the door and frame, the site of some our best craftsmanship yet! We started to finish up the stud walls and frame the door, we also cut out the bottom 2x4 for the doorway and started framing the cieling drywall supports.

 Oh yeah, spot on.

 Just look at those joints.

 All starting to come together now, we might just get done in time for Halloween afterall....any takers on that bet?
 Some of the technical wizardry I plan on installing:Netgear 24 Port 10/100/1000 switch & 24 port cat6 patch panel.
 My 3ft 2 post wall mount rack, and box of leviton faceplates and ports.
Leviton Jacks and plates upclose, from left to right: cat6 connector, quad plate, positive speaker connector, ground speaker connector.