Tuesday, January 31, 2012

Basement Project: Day 10


Day 10 The electrical is 99.99% done, all I got left is a coax run to the AV closet I forgot about...

 On to the progress: cans!
 Electrical box, labeled.
 Have you ever seen so much wiring in a ceiling?!
 Projector HDMI and electrical boxes. The electrical actually leads back to a standard male outlet plug so that it can be on a UPS.

 New RCA run for the subwoofer, got a Leviton single snap in quick port to match
 The completed network rack with coax juntion panel

 Coax splitter panel:
 Leviton touch dimmer, these things kick ass! With one touch they turn on/off remembering previous brightness levels and when you press and hold they slide the lights up and down the brightness scale.
 Sconce wiring boxes.

 Backside of the Rack.
 Un-loaded sub panel.
Breakers and grounding wire.