Tuesday, January 31, 2012

Basement Project: Day 2 & 3



 Finishing up the floor...
 The completed wall with studs.
 Future wine cellar and pantry to cover up water main entry point.
 This wall will house the 110" movie screen and we will wall in the window, to the left will be a closet to hide the sump pump and AV equipment.
 The work area and framing up the doorway to the unfinished side, it took us a while to figure out how to hang the 2x4 from the I-beam. But I think that will frame up nicely down the length of the wall. We still haven't decided if we are going to drywall and soffit that small doorway or use a few drop ceiling tiles....
 Our messy laundry area.
 The 36" doorway. 

 The site of the future office and computing area. Will have 10, 10/100/1000 ports, about 7 computers and built in desks, on the opposite side of the wall in the unfinished side a 3ft rack that will house the 24port switch, cable modem, router, media server, patch panel, etc. I got 1000ft cat6, 24 port patch panel, 24 port netgear switch, 24 1ft cat6 patch cables at newegg for under $400. I will be using leviton quad face plates for the cat6, video, and speaker wire connections.
 The Beautiful Sarah