Tuesday, January 31, 2012

Basement Project: Day 12


Day 12: The drywall begins!!!!
 Let there be light, and insulation...

 Starting to feel more like a room than a basement..
 I know its against procedure but were putting up the drywall on this wall to keep it against the i beam for support (the drywall on the ceiling will squish it against the i beam) since there is no mounting point for the last 8 inches or so...


 The office doorway, now I just need to add the two bi fold doors.
  Insulation inside the office, it took less insulation to do the entire basement than I thought, 10x50sq ft rolls, I still need one more roll for the last wall where we have yet to run plumbing for the sink.
The last wall:
 The vapor barrier and last (11th) roll of insulation, and before anybody asks, yes paper back + vapor barrier and R11 because it is the proper R value for my application that provides the best acoustic properties. 
Shot of the two electrical boxes all finished, the breakers now control the overhead lights until we get the switches wired.